Gilbert Road Sewer

 

 

Gilbert Road SewerGilbert Road Sewer<div class="ExternalClass9992334AD4324D36AC70CBD6121FC5B4"><p>The Gilbert Road Sewer is a large pipe that collects most of the sewage in the City of Richmond and conveys it south to the Lulu Island Wastewater Treatment Plant. The existing sewer is currently operating at full capacity, making regular inspection and maintenance costly and highly disruptive to the community. </p><p>Metro Vancouver will be constructing a second sewer line next to the existing pipe. The new pipe will be designed specifically to minimize backups and overflows, and accommodate future growth in the City of Richmond. </p><p>Construction along Gilbert Road will happen in multiple phases, beginning in 2018 and continuing for several years.<br></p></div>Richmond

Project Update


  • Single-lane alternating traffic on Hollybridge Way from River Road to Lansdowne Road - June 25, 2018

    Due to sewer construction, single-lane alternating traffic will be in effect on Hollybridge Way from River Road to Lansdowne Road in the City of Richmond, with possible traffic delays along Elmbridge Way, Landsdowne Road and River Road.

    Construction will begin on Monday, June 25, 2018 and is expected to last for approximately one month.

    Motorists should reduce speed in the area and expect delays. Please use extra caution near pedestrian areas and follow posted signage and the directions of traffic control personnel.


 

 

Page 2 Native Filehttp://heimat-deutschland.info/services/liquid-waste/construction-maintenance/ConstructionProjectPictures/_t/GilbertRoadMap_jpg.jpghttp://heimat-deutschland.info/services/liquid-waste/construction-maintenance/ConstructionProjectPictures/Forms/DispForm.aspx?ID=2&RootFolder=/services/liquid-waste/construction-maintenance/ConstructionProjectPicturesPage 2 Native File

 

 

<div class="ExternalClass798F9958A10F4519B7225BF4DCE91B30"><p>Activities associated with this work include:</p><ul><li>Temporary closures of intersections along Gilbert Road</li><li>Restricted access to properties along Gilbert Road</li><li>Temporary traffic increases around construction areas</li><li>Occasional odour</li><li>Noise</li></ul></div><div class="ExternalClassE162564E4B8A4CC08EF865B334C45496"><p>Work will generally occur from Monday to Saturday, between 7:00 a.m. to 8:00 p.m. However there may be times when crews will work extended hours in order to maintain the construction schedule. Information updates will be provided as construction proceeds.</p></div><div class="ExternalClassD6E82756D8484953BC0C854C8A9207AD"><p>Metro Vancouver is working with the community to ensure concerns and interests are heard and considered. A Community Liaison Officer has been appointed to this project and is available to speak to residents and businesses about the project.</p><p>​If you have any questions or concerns, please don’t hesitate to contact our Community Liaison Officer Steve Billington at 604-432-6200 or <a href="mailto:[email protected]">[email protected]</a>.  </p> <p>To receive updates about this project, please email <a href="mailto:[email protected]">[email protected]</a> with the subject “Gilbert Road”.</p></div>

 

 

2018 - 2021

 

 

Gilbert Road Fact Sheet - December 2017 http://heimat-deutschland.info/services/liquid-waste/construction-maintenance/ConstructionProjectPublications/GilbertRoadSewer-FactSheet-December2017.pdfGilbert Road Fact Sheet - December 2017

 

 

<div class="ExternalClass148579E7C5BF4EDF96C589EB3BB8F0F0"><p> <strong><strong>​Mon. to Fri. (8 am - 4:30 pm)<br></strong></strong>Community Liaison Officer, 604-432-6200</p> <p> <strong>After-Hours Emergencies: <br></strong>604-451-6610</p><p> <strong>Email:</strong><a href="mailto:[email protected]?subject=Gilbert Road Trunk Sewer"><br>Information Centre</a></p></div>

Stay Connected


Subscribe to our mailing list to receive e-newsletters about our Liquid Waste engagement projects

 

Sign up
Купить Виагра 130 мг

http://www.pills24.com.ua

progressive.ua